14 February 2014

"Mean Machine" Angel - Prep 1a

Clean-up of the mechanical arm is done(!) and it is now ready to receive its enhancements. To date, I have singled out four items to be added: 2 cables, 1 wire, and a hydraulic hose. I may decide to add a wire or two more (as filler), but I want to keep things relatively simple and clean.

Movin' right along. . . 

FOLLOW-UP 15.02.2014. . . The final tally of enhancements is as follows: 2 cables, 2 wires, and 2 hydraulic hoses. All the enhancements, save for the wires, have been sized and fitted. 

Back to general clean-up! 

UPDATE 16.02.2014. . . MM is now pegged (brass tubing) and fitted to the groundwork.

UPDATE 17.02.2014. . . MM is now on its workbase. . . and the pre-prime assembly of the me- chanical arm has been completed, and the arm fitted. Almost there! 

No comments:

Post a Comment