The vambraces have been roughed-in with MS; Phase 1 finishing has been completed.
FOLLOW-UP--The vambraces are essentially DONE! I am well into the finishing stage. . . Next: distressing the surfaces and weathering; followed by lacing. . .
27.08.2019--The surface of the right vambrace has been textured and distressed.
31.08.2019--One column of lacing on the right vambrace has been completed.
01.09.2019--The right vambrace is DONE!
02.09.2019--The lacing on the left vambrace is done.
04.09.2019--The left vambrace is DONE!
“When the cost of a hobby exceeds the fun and doesn't attract new people, the game is over.” -
Oscar Koveleski, August 2003
No comments:
Post a Comment