12 January 2012

Ghost Rider (1): Day 2. . .

The body has been filled with PUR; the legs sectioned at the knees; and the left boot pegged and lengthened. Preliminary putty-work (MS) has begun on the denims, as has reduction on the jacket (collar, ventral volume).

No comments:

Post a Comment