11 January 2012

Ghost Rider (1): Day 1. . .

All the basic subassemblies, where possible, have been completed. Now, the introductory “To-Do” List:

  1. Rework the struts.
  2. Rework the “grill”. [IP]
  3. Shorten and rework the rear suspension. [IP]
  4. Add exhaust pipe/s.
  5. Add foot pegs.
  6. Reposition and rescale legs. [IP]
  7. Rework the boots: notably, lengthen left boot. [IP]
  8. Rework the jacket: most notably, the collar. [IP]
  9. Reposition handle bars: including addition of basic gauges. And if that works. . .
  10. Add gas cap/medallion.

And that's just for starters! Once the "basic model" has been finalized, and I imagine 70-80% completed, then I can start figuring out the lighting, basing, etc.

No comments:

Post a Comment